Advertisement
  • National News
  • State News
  • Contact Us
  • Subscribe
  • My Account
Subscribe For $2.50/month
Print Editions
News Journal
  • News
    • Local
    • Sports
    • School
    • Courthouse
      • Deeds
  • Obituaries
  • Opinion
  • Spiritual
    • Parabola
    • Transcendental Meditation
    • The Episcopal Diocese of Virginia
    • Southern Baptist
  • eJournal
  • Legals
  • Classifieds
  • Contact Us
  • My Account
  • Login
  • FAQ
No Result
View All Result
News Journal
No Result
View All Result
News Journal
No Result
View All Result

Work proceeding on New River Valley Amtrak stop

Mountain Media, LLC by Mountain Media, LLC
September 29, 2026
in Local Stories, Local Stories
0
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter
Photos courtesy of Virginia Passenger Rail Authority
An overhead view of the Cambria station, looking east. The soldier pile lagging wall, or retaining wall, holds Depot Street from the future bus lane.

By Marty Gordon

[email protected]

The Virginia Passenger Rail Authority has announced the New River Valley’s Amtrak passenger rail project is making good progress.

This past week, they gave an update on where it currently stands.

At the site of the future station in Christiansburg, construction of the passenger platform continues with crews installing formwork for platform walls, columns and beams. This formwork is used to cast concrete and is temporary to the platform. It is removed as the crews continue to progress the platform construction to the east.

Crews have placed the majority of the platform’s concrete walls, columns and beams. The first precast concrete planks have been set on top of the beams at the west end of the platform, and eventually a concrete slab will top the planks to create the walking area of the platform.

The first of many precast concrete planks has been installed on the western end of the platform.

The soldier pile lagging wall is a retaining wall which will keep the soil under Depot Street separate from the bus lane in front of the station.

The wall is made up of over 100 steel H-piles, or beams, with timber lagging in between each pile. Precast concrete panels with an architectural finish will cover the timber and line the wall. Crews have only a few more piles to install before they begin placing the final finished precast concrete panels.

The future layover facility at Radford is nearing completion. The layover tracks have been placed, graded, and leveled with ballast and are now in their final location. All the facility lighting and train servicing equipment have been installed.

The Amtrak modular staff building is currently in production and will be delivered to the site this fall. Crews are now preparing the area for asphalt pavement.

Passenger rail service is expected to begin in the fall of 2027.

An overhead view of the Radford layover facility, looking west.

Sign up to our newsletters

Enter your email address to join our newsletters.

You will receive a confirmation email for your subscription. Please check your inbox and spam folder to complete the confirmation process.
Some fields are missing or incorrect!
Lists
Previous Post

Town of Blacksburg installs rooftop solar power system 
System will save $2.2 million in energy costs

Next Post

Lt. Governor, best-selling author lead Radford discussion on Appalachian culture

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

News Journal

Navigate Site

  • News
  • Obituaries
  • Opinion
  • Spiritual
  • eJournal
  • Legals
  • Classifieds
  • Contact Us
  • My Account
  • Login
  • FAQ

Follow Us

  • Login
Forgot Password?
Lost your password? Please enter your username or email address. You will receive a link to create a new password via email.
body::-webkit-scrollbar { width: 7px; } body::-webkit-scrollbar-track { border-radius: 10px; background: #f0f0f0; } body::-webkit-scrollbar-thumb { border-radius: 50px; background: #dfdbdb }
No Result
View All Result
  • News
    • Local
    • Sports
    • School
    • Courthouse
      • Deeds
  • Obituaries
  • Opinion
  • Spiritual
    • Parabola
    • Transcendental Meditation
    • The Episcopal Diocese of Virginia
    • Southern Baptist
  • eJournal
  • Legals
  • Classifieds
  • Contact Us
  • My Account
  • Login
  • FAQ